RP-2 Pitched Tin Solar Roof Mounting System

Share:

SIMPLE INSTALLATION AND TOP QUALITY PERFORMANCE FOR YOUR FLAT ROOF PROJECTS

PMT EASY is suitable for roof surfaces with a pitch between 0 and 10° and can be used in almost all European wind and snow load zones.

During the planning process, unused roof surfaces and disturbed areas are efficiently converted with PMT EASY . The result is an optimized use of space, which in turn leads to increased energy production in relation to the existing roof area. As an additional benefit, we offer a 15-year guarantee for PMT EASY , which also includes the EasyPlates.

 
Read More Read Less
TP-1 Adjustable Triangle Solar Mounting System
IDEAL CLAMPING POINTS
1 SYSTEM - 2 CLAMPING TYPES
PMT EASY ensures maximum installation efficiency with its two clamping types, edge clamping and quarter-point clamping. Whatever challenges a project poses - the system has the solution.
 
 
SIMPLE ASSEMBLY
PRE-ASSEMBLED SYSTEM
Only one tool is required to ensure fast assembly thanks to the intuitive push & click technology. The high degree of pre-assembly of the components also increases material availability and simplifies logistics at the same time.
 
 
EASY HANDLING
LARGER MODULES - MORE POWER
The swivel-mounted module assembly enables particularly easy handling of large modules - insert the module vertically, fold it over and you're done. The modules can also be easily removed again for easy maintenance.
 
 
SMART STRUCTURE
UNCOMPROMISINGLY SAFE
The system ensures secure installation even with large modules and minimizes the risk of micro-cracks at the same time. Thanks to the pivoting mounting, leaning on the module is prevented and thus protects against possible damage.
 
 
EASYPLATES
THINKING CROSSWISE

PMT EASY ensures a flat load and therefore better load distribution thanks to a support surface of approx. 600 cm² per EasyPlate. The cross connection ensures a strong, efficient system connection thanks to rigid steel profiles, so that point loads are avoided. The EasyPlates offer additional protection without plasticizer migration.

 

nisi ut aliquip ex ea com mmodo consequat.

 
SIMPLIFIED PLANNING
PLAN SIMPLY, PROFIT FASTER
The system allows disruptive areas on the roof to be optimally avoided and converted. The result is an optimization of the use of space and a further increase in the energy yield in relation to the existing roof area.
 
 
LARGER MODULE FIELDS
MAXIMIZED SOLAR SURFACES
For maximum space utilization, the EASY mounting system enables the installation of large module fields of 30 x 30 m.

ad minim veniam, quis exercitation ullamco laboris nisi ut aliquip ex ea com mmodo consequat.

 
Ideal clamping points

1 SYSTEM - 2 CLAMPING TYPES

PMT EASY ensures maximum installation efficiency with its two clamping types, edge clamping and quarter-point clamping. Whatever challenges a project poses – the system has the solution.

 

1 SYSTEM - 2 CLAMPING TYPES

PMT EASY ensures maximum installation efficiency with its two clamping types, edge clamping and quarter-point clamping. Whatever challenges a project poses – the system has the solution.

 

1 SYSTEM - 2 CLAMPING TYPES

PMT EASY ensures maximum installation efficiency with its two clamping types, edge clamping and quarter-point clamping. Whatever challenges a project poses – the system has the solution.

 

1 SYSTEM - 2 CLAMPING TYPES

PMT EASY ensures maximum installation efficiency with its two clamping types, edge clamping and quarter-point clamping. Whatever challenges a project poses – the system has the solution.

 

1 SYSTEM - 2 CLAMPING TYPES

PMT EASY ensures maximum installation efficiency with its two clamping types, edge clamping and quarter-point clamping. Whatever challenges a project poses – the system has the solution.

 

1 SYSTEM - 2 CLAMPING TYPES

PMT EASY ensures maximum installation efficiency with its two clamping types, edge clamping and quarter-point clamping. Whatever challenges a project poses – the system has the solution.

 

Add Your Heading Text Here

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

 

Dachneigung

0° bis 30°
 

Dacheindeckung

Folie, Bitumen, Beton, Sandwich
 

Standardsprungmaß

Modullänge X + 160 mm von Modulvorderkante zu Modulvorderkante (Sonderprojekte möglich). Details entnehmen Sie bitte dem Projektbericht.
 

Gewicht

Niedrige Flächenlast ab 1,25 kg/m², ca. 10,7 kg/m², Unterkonstruktion + Modul
 
 

Dachanbindung

Unsere Unterkonstruktion Schrägdach PV ist ohne Dachdurchdringung installierbar.
 
 

Mindestanordnung

2 Reihen à 3 Module, oder 3 Reihen à 2 Modulen
 
 

Material

Für unsere PV-Montagesysteme Schrägdach verwenden wir ausschließlich hochwertiges Aluminium EN-AW-6063-T3 und Edelstahl A2-70. Es werden keine verzinkten Bauteile und Kunststoffe genutzt.
 

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

 

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

 

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

 

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

 

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

 

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

 

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

 

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

 

Description

RP-2 Pitched Tin Solar Roof Mounting System

1.   Introduction

Pitched Tin Roof Mounting system is designed with patented and innovative rail, standard components and highly pre-assembled clamps, which make the installation to be simple with great flexibility. Please read the entire manual carefully before installation.

 

2.  Tool and equipment

RP-2 Pitched Tin Roof Mounting Part 1

3.  Components

RP-2 Pitched Tin Roof Mounting Part 2

4.   Installation

4.1.   Install the L-foot

Please prepare all the needed tools and related products before the installation, Mark positions of all the L-foot according to the construction drawing. L1 is determined by the span length of roof metal purlin, the length normally equals   half-length of solar panel. L2 equals the span length of L-foot, which is same as the construction drawing. Please make sure that all the L-foot be aligned horizontally and vertically. Then fixing the L foot on metal purlin by 6.3x80mm self-tapping screw.

RP-2 Pitched Tin Roof Mounting Part 3

4.2.   Install the rails

(Connect the rails with rail splice if the rails are not long enough, otherwise skip this step) Insert the rail splice half into first rail and then fix it with 1pc M8x12 hex bolt. Then insert the other half of rail splice into second rail, match them together and then fix them with 1pc M8x12 hex bolt as well. Then the first and second rails are connected.

RP-2 Pitched Tin Roof Mounting Part 4

Fixing the rail on L-foot kit by Z-nut. (The Z-nut is already assembled on the L-foot.)

RP-2 Pitched Tin Roof Mounting Part 5

4.3.   Install the solar panels

Suggest to start the installation from left side of the bottom. Each mid clamp needs to be equipped with one grounding washer. Two end clamps of each array/line need to be equipped with two grounding lugs.

RP-2 Pitched Tin Roof Mounting Part 6

RP-2 Pitched Tin Roof Mounting Part 7

5.  Installation notes

5.1.Notes for dimensions

All the dimensions should be subject to the construction drawing. This guide book is for descriptive purpose of installation only.

5.2.Notes for stainless steel fasteners

Stainless steel material is quite different to carbon steel with its excellent ductility. It would be unable to unscrew the bolt and nut after matching in case improper use. That is “lock up”, known as “dead lock”. Methods to avoid lock up as below:

5.2.1. Reduce the friction coefficient

(1) Make sure the surface of threads to be clean (without dusts or clutters);

(2) Suggest to apply water wax or lubricant on surface for installation (such as butter or 40# machine oil)

5.2.2. Use correct operation method

(1) The bolt must be perpendicular to the axis of thread when screwing. Do not lean the bolt;

(2) Apply the force evenly when tightening and the tightening torque should not exceed the specified secure torque value;

(3) Using torque wrench or socket spanner as far as possible, avoid using monkey wrench or electric wrench; Adjust the rotational speed as low as possible when using electric wrench;

(4) Avoid high temperature; To avoid lock up which caused by sharply increasing temperature, do not rotate rapidly. (like using electric wrench)

(5) Allowable tightening torque of A2-70 stainless steel bolt: M8 bolt: 11 ± 1N * m; M10 bolt: 20 ± 1 N * m; M12 bolt: 35 ± 1 N * m

 

Additional information

Material

AL6005-T5

Application

PV Solar Panel Installation

Color

Natural Silver

Tilt Angle

0 ~60

Feature

Easy Quick Installation

Service Life

12 years' warranty ;25 years service life

Send us a Message